BERTHS
Title | Document |
Berthing Programme Dt. 03-10-2024 | View / Download |
Berthing Programme Dt. 02-10-2024 | View / Download |
Berthing Programme Dt. 01-10-2024 | View / Download |
INNER
Habour - East Quay Berths
|
||||||
SI. NO. |
BERTH |
LENGTH (M) |
DRAFT (M) |
YEAR OF COMISSION |
CARGO |
EQUIPMENT |
1. |
560.00 |
14.50 |
2019 |
|
Work
order issued for installation of 1 no 100T(MHC) MOBILE
HARBOUR CRANE |
|
2. |
280.00 |
11.00 |
1966 |
|
4
Nos. 2OT Capacity Electric wharf Cranes |
|
3. |
255.00 |
14.50 |
1995 |
|
1
no. 14OT HMC |
|
INNER
Harbour - West Quay Berths
|
||||||
4. |
212.00 |
13.50 |
1994 |
|
2 no. 140T HMC’s are operational from WQ1 to WQ3
berths. |
|
5. |
226.70 |
13.50 |
1992 |
|
||
6. |
201.12 |
13.50 |
1992 |
Coal |
||
7. |
243.00 |
11.50 |
1965 |
|
Bulk cargos are being handled with ship
cranes Caustic Soda is handled through under ground
pipeline |
|
8. |
241.70 |
11.50 |
1965 |
|
Conveyor System for loading alumina (2200TPH) and Caustic Soda (600TPH) |
|
9 |
255.00 |
14.00 |
2015 |
|
2 Nos. 60T capacity Rail Mounted level luffing
cranes. |
|
Note:
# ·
The WQ6 was
awarded to M/s West Quay Multiport Pvt. Ltd. on 07.10.2011 on PPP. ·
The project
commissioned on 13.07.2015 ·
The
Concessionaire stopped the operations since March, 2019 ·
The Concession
Agreement stands terminated w.e.f. 31.05.2020 ·
Action
initiated for fresh proposal for revamping of the existing WQ6 terminal under
PPP mode. ·
Actions have
been taken for step-in on 20.10.2020 to utilize the stack yard. TEFR is under finalization |
||||||
10.
|
280.00
|
14.50
|
2018
|
|
1 no 100 T HMC is operational at WQ7
& WQ8 berths. (Mechanization is in progress) Another 100T HMC shall be
deployed by June 2021
|
|
11.
|
280.00
|
14.50
|
2018
|
|
||
>INNER
Harbour - Western Arm
|
||||||
12.
|
167.64
|
10.06
|
1957
|
|
Direct discharge through pipeline to
tank farms.
|
|
13.
|
183.00
|
10.06
|
1957
|
|
Direct discharge through pipeline to
tank farms.
|
|
14.
|
183.00
|
9.57
|
1957
|
|
Direct discharge through pipeline to
tank farms.
|
|
15. |
OR-III |
180.00 |
11.00 |
2021 |
|
Direct discharge through pipeline to tank farms. |
OUTER Harbour |
||||||
16. |
408.00 |
17.00 |
1985 |
|
Three unloading arms with discharge
capacity of 5500 tonnes per hour |
|
17. |
371.00 |
14.50 |
1998 |
|
Marine uploading arms, Pipelines and
Direct |